News Center

Since 2019, our company has carried out an extensive ecological restoration project along approximately 3 kilometers of the riverfront, covering an area of 700,000 square meters. More than 15,000 large trees, including weeping willows, camphor trees, and dawn redwoods, have been planted. At the same time, recreational facilities such as a mini-marathon trail, a music plaza, and boardwalks have been constructed, creating a vibrant wetland park landscape.
Through continuous restoration and environmental management, the wetland park has been transformed into a flourishing green oasis, with lush trees, abundant vegetation, colorful blossoms in spring, and sweeping reed beds in autumn. Its thriving ecosystem now provides a habitat for more than 20 species of migratory birds. Visitors can stroll along the scenic riverside pathways, enjoy panoramic views of both the natural surroundings and the industrial waterfront, and capture memorable photos against the backdrop of the towering blast furnaces.
Let our experienced team provide reliable solutions for your steel requirements.


